Power on the schedule the campus actually needs.

AI campuses are being built faster than the local utility can usually feed them. We build the customer-side substation, the redundant power lines, and the medium-voltage distribution that brings power to each building — on your schedule, not the utility’s queue. If the utility connection is the bottleneck, our parent company can supply temporary on-site power until the grid catches up.

Hyperscale data center developers, AI training campus operators, cloud builders, and the engineering firms working with them.

Audience
Hyperscale & AI
600 MW energized in 14 months · ERCOT

Why teams in this sector pick us.

The advantages your procurement team is looking for when they evaluate contractors.
  • 01

    One company, all the work.

    Site work, foundations, steel, controls, testing — all done by our own crews. Your investor commitments live inside one organization, not five.

  • 02

    Building-by-building turn-on.

    We energize the campus one hall at a time, so the first servers can take power months before the last building is finished. On our recent North Texas project, first servers took load on day 423.

  • 03

    Bridge power when you need it.

    When the utility connection is the bottleneck, our parent company supplies 2–60 MW gas turbines. We integrate them with the substation we are building, so first power lands on your schedule.

  • 04

    Equipment ready to ship.

    Transformers and switchgear are pre-positioned through our parent company’s procurement bench. Long lead times rarely become your critical path.

Common questions.

Questions from teams evaluating us as a partner.

Phase 2 already on the board?

We help most when we get involved early — connection studies, long-lead equipment, and substation siting before the project starts.

Talk to the build team