Power on the schedule the campus actually needs.
AI campuses are being built faster than the local utility can usually feed them. We build the customer-side substation, the redundant power lines, and the medium-voltage distribution that brings power to each building — on your schedule, not the utility’s queue. If the utility connection is the bottleneck, our parent company can supply temporary on-site power until the grid catches up.
Hyperscale data center developers, AI training campus operators, cloud builders, and the engineering firms working with them.
- Audience
- Hyperscale & AI
Why teams in this sector pick us.
- 01
One company, all the work.
Site work, foundations, steel, controls, testing — all done by our own crews. Your investor commitments live inside one organization, not five.
- 02
Building-by-building turn-on.
We energize the campus one hall at a time, so the first servers can take power months before the last building is finished. On our recent North Texas project, first servers took load on day 423.
- 03
Bridge power when you need it.
When the utility connection is the bottleneck, our parent company supplies 2–60 MW gas turbines. We integrate them with the substation we are building, so first power lands on your schedule.
- 04
Equipment ready to ship.
Transformers and switchgear are pre-positioned through our parent company’s procurement bench. Long lead times rarely become your critical path.
What we do for hyperscale & ai programs.
AI & Data Center Power
Substations, redundant power feeds, and the medium-voltage distribution that powers data center campuses. From 100 MW to 1,200 MW, with phased turn-on for early load.
Read moreSubstation
New substations, upgrades to existing ones, and additions to live yards. From the concrete foundations through the relays that protect the system, all done by our own crews. Our team provides full-service electrical substation engineering, construction, and restoration support for new developments and repurposed industrial sites.
Read moreTransmission
New construction, rebuilds, and upgrades on transmission lines from 69 kV to 500 kV. When an outage is not an option, our crews has knowledge and expertise in live-line / barehand construction and maintenance.
Read moreBattery Storage
Standalone and co-located battery systems from 10 MW to 400 MW. We build the batteries, the substation that connects them to the grid, and handle all the testing.
Read moreHyperscale & AI projects.
Common questions.
Phase 2 already on the board?
We help most when we get involved early — connection studies, long-lead equipment, and substation siting before the project starts.